Nothing picked. The calculation runs on the values entered by hand.
Every length of the run whose conditions differ is a section with its own tab. IEC 60364-5-52:2009, 523.8 sizes the conductor for the most adverse of them — block 7 says which.
Pick the installation being built. All 48 of IEC 60364-5-52:2009 Table A.52.3 are here; the letter on a card is the reference method the standard rates that installation by. The two rows of filters are ours — a finding aid built from the wording of the items themselves.
Pick an installation above.
What turns the tabulated rating into the rating of this run. Only the correction tables that the reference method of block 4 is rated by are shown, and every value is a tabulated column of the table beside it — the standard has a run between two columns rated on the next column up, so there is nothing to interpolate.
Current-carrying capacity is one requirement of several. The plan below is drawn from what you entered; untick anything the project covers elsewhere.
| # | Section | Length, m | Method | Group | Medium, C | Soil | Ca | Cg | Cs | C | Iz table, A | Corrected Iz, A | Section required, mm2 |
|---|
FREE performs one complete feeder check, with as many route sections as the run has. PRO adds multi-feeder schedules and shared editable reports.
| # | Case | Expected | Computed | Status |
|---|